50 lakh Jeevika Didis to become dairy 'Sudha Sakhis'
COMFED and Jeevika plan to grow Bihar's milk producers from about 12 lakh to over 50 lakh, mainly by bringing rural women into dairy.
Read storyCOMFED and Jeevika plan to grow Bihar's milk producers from about 12 lakh to over 50 lakh, mainly by bringing rural women into dairy.
Read storyFive model villages per district will train farmers from nine neighbouring villages each in crops and methods that cope with floods, drought and heat.
Read storyProcurement starts on 1 November in North Bihar and 15 November in the south, using AgriStack IDs and online registration.
Read storyThe cluster at BIADA Mahwal has shared manufacturing facilities, and FDDI will train workers for footwear jobs.
Read storyThe ₹400 crore Patliputra facility is Bihar's first large data centre; a 150 MW hyperscale AI campus is planned for Bodh Gaya.
Read storyThree more 800 MW units are proposed at the Bhagalpur project, which is expected to employ 10,000–12,000 people during construction.
Read storyThe Energy Department has drawn up a plan to replace 1.18 lakh km of poles and cables and 12,000 transformers to end low-voltage and tripping problems.
Read storyFootfall rose by about 16 lakh over last year, helped by a tent city, AI translation for foreign visitors and wristbands for children and the elderly.
Read storyThe area under makhana is to double to 82,000 hectares, and farm income from the crop has risen more than twelvefold since 2012–13.
Read storyA multi-storey station building, a terminal for 1 lakh passengers a day and a direct metro link are planned under the Amrit Bharat scheme.
Read storyThe Chief Minister launched projects worth over ₹400 crore and said Sone river water will reach Sasaram and Aurangabad before next March.
Read storyThe state's water-and-greenery mission has restored public ponds and water bodies since 2019 and is aiming for 30% green cover.
Read story